Into Lassen Volcanic, from our side of the park
The two entrances that start in Chester, what those roads are really like, and the fees including the ten dollar winter rate.
Read the Lassen guidePlanning a Lassen trip
The thirty mile road through the middle of Lassen Volcanic is shut by snow for most of the year, and the day it opens has landed anywhere between 28 April and 26 July. Here is every date the Park Service has recorded since 1980, in one table, and what that record is actually worth when you are choosing a week.
Every date, snow depth and road description below is the National Park Service’s own. The dates were read from its spring clearing page on 2 October 2026. The arithmetic underneath them is ours, and every figure we worked out is shown so you can check it against the table.
If you only want the recent pattern, this is it. These are the seven years our Lassen guide carries, pulled out here so they have a page of their own.
| Year | Plowing began | Road opened | Snow depth 1 April | Road closed |
|---|---|---|---|---|
| 2020 | 19 March | 29 May | 119 in, 10 ft | 13 November |
| 2021 | 5 April | 17 May | 114.5 in, 9.5 ft | 21 October |
| 2022 | 16 March | 3 June | 96 in, 8 ft | 6 November |
| 2023 | 15 May | 1 July | 217 in, 18 ft | 5 December |
| 2024 | 30 April | 20 June | 193 in, 16 ft | 6 December |
| 2025 | 21 April | 27 June | 208 in, 17 ft | 24 October |
| 2026 | 2 April | 22 May | 91 in, 7.6 ft | still open |
Seven years, and 45 days between the earliest opening and the latest. A trip booked for the second week of June would have found the road open in 2020, 2021, 2022 and 2026, and shut in 2023, 2024 and 2025. That is the whole problem with planning around this road, in one sentence.
The Park Service keeps the full record on its spring clearing page, and it goes back to 1980. We have reproduced all 47 years here, in the same columns, because the long record answers questions the recent one cannot: how unusual a July opening really is, and how little the plowing start date tells you about the finish.
| Year | Plowing began | Road opened | Snow depth 1 April | Road closed |
|---|---|---|---|---|
| 1980 | 20 April | 29 May | 231 in, 19.3 ft | 21 November |
| 1981 | 20 April | 21 May | 149 in, 12.5 ft | 3 November |
| 1982 | 19 April | 18 June | 266 in, 22.2 ft | 25 October |
| 1983 | 18 April | 2 July | 331 in, 27.6 ft | 10 November |
| 1984 | 23 April | 4 June | 175 in, 14.6 ft | 28 October |
| 1985 | 14 April | 18 May | 163 in, 13.6 ft | 21 October |
| 1986 | 7 April | 7 June | 195 in, 16.3 ft | 24 November |
| 1987 | 20 April | 15 May | 138 in, 11.6 ft | 13 November |
| 1988 | 2 April | 20 May | 98 in, 8.2 ft | 7 November |
| 1989 | 3 April | 6 June | 223 in, 18.6 ft | 23 October |
| 1990 | 1 April | 28 April | 106 in, 8.9 ft | 14 November |
| 1991 | 7 April | 24 May | 151 in, 12.6 ft | 22 October |
| 1992 | 6 April | 14 May | 127 in, 10.6 ft | 29 October |
| 1993 | 12 April | 28 June | 225 in, 18.8 ft | 10 November |
| 1994 | 3 April | 20 May | 101 in, 8.4 ft | 7 November |
| 1995 | 19 March | 21 July | 287 in, 23.9 ft | 21 November |
| 1996 | 1 April | 12 June | 171 in, 14.3 ft | 18 October |
| 1997 | 7 April | 5 June | 135 in, 11.3 ft | 14 November |
| 1998 | 5 April | 12 July | 250 in, 20.9 ft | 10 November |
| 1999 | 12 April | 11 June | 194 in, 16.2 ft | 19 November |
| 2000 | 3 April | 2 June | 178 in, 14.9 ft | 17 November |
| 2001 | 2 April | 10 May | 109 in, 9.1 ft | 15 November |
| 2002 | 1 April | 22 May | 166 in, 13.9 ft | 13 November |
| 2003 | 26 March | 23 May | 185 in, 15.5 ft | 7 November |
| 2004 | 11 March | 27 May | 187 in, 15.6 ft | 28 October |
| 2005 | 4 April | 2 June | 173 in, 14.5 ft | 8 November |
| 2006 | 3 April | 6 July | 266 in, 22.2 ft | 11 November |
| 2007 | 2 April | 18 May | 112 in, 9.3 ft | 6 December |
| 2008 | 31 March | 18 May | 132 in, 11 ft | 12 December |
| 2009 | 13 April | 4 June | 146 in, 12.2 ft | 18 November |
| 2010 | 19 April | 8 July | 169 in, 14.1 ft | 23 October |
| 2011 | 19 April | 16 July | 242 in, 20.2 ft | 22 November |
| 2012 | 21 April | 1 June | 145 in, 12.1 ft | 19 November |
| 2013 | 21 March | 24 May | 140 in, 11.7 ft | 18 December |
| 2014 | 3 April | 19 May | 122 in, 10.2 ft | 1 December |
| 2015 | 31 March | 3 May | 91 in, 7.6 ft | 8 November |
| 2016 | 18 April | 12 June | 199 in, 16.6 ft | 30 October |
| 2017 | 4 April | 26 July | 243 in, 20.3 ft | 10 November |
| 2018 | 30 March | 27 May | 131 in, 11 ft | 20 November |
| 2019 | 18 April | 22 June | 238 in, 19.8 ft | 29 November |
| 2020 | 19 March | 29 May | 119 in, 10 ft | 13 November |
| 2021 | 5 April | 17 May | 114.5 in, 9.5 ft | 21 October |
| 2022 | 16 March | 3 June | 96 in, 8 ft | 6 November |
| 2023 | 15 May | 1 July | 217 in, 18 ft | 5 December |
| 2024 | 30 April | 20 June | 193 in, 16 ft | 6 December |
| 2025 | 21 April | 27 June | 208 in, 17 ft | 24 October |
| 2026 | 2 April | 22 May | 91 in, 7.6 ft | still open |
Source: National Park Service, winter road closures and spring clearing update, read 2 October 2026. The snow depth column is the 1 April reading at Lake Helen, at 8,200 feet. The Park Service notes of the closing column that it is the date the park highway officially closed for the year, and that the road may temporarily close earlier for lighter snowfalls, so a closing date is not a promise that the road ran uninterrupted up to it.
Two honest notes about the table itself. The 2026 closing cell is blank on the Park Service page because the road has not closed for the year yet, so we have written it as still open. And the page we copied it from carries its own last updated line reading 24 May 2026, which is the week the 2026 opening went in. Check the source before you lean on the newest row.
The dates alone are a grid. The arithmetic is where the planning value is, so here it is, worked out from the table above and nowhere else.
By month, across all 47 years. One opening in April, 21 in May, 17 in June and eight in July. May is the single most common month and June is close behind it, which is why a Memorial Day plan is a coin toss and a late June plan usually is not.
Cumulatively. Five of the 47 years were open by 15 May. Twenty-two of 47 were open by 31 May. Thirty-four of 47 were open by 15 June, 39 by 30 June, and 44 by 15 July. Read it the other way and three recorded years had the road still shut in the second half of July.
The last twenty years, 2007 to 2026, read slightly later than the full record. Nine of those twenty were open by 31 May, 13 by 15 June and 16 by 30 June. We are not going to tell you why, because we do not know and we are not going to guess at a trend from twenty numbers.
Snow depth matters, and it does not decide. The deepest 1 April reading in the record is 331 inches, 27.6 feet, in 1983, and the road opened on 2 July that year. The shallowest reading appears twice, 91 inches or 7.6 feet, in 2015 and again in 2026, and those two years opened on 3 May and 22 May, nineteen days apart on identical snow. The Park Service's own sentence on this is the one to trust: spring clearing schedules and opening dates vary from year to year and cannot be predicted.
The plowing start tells you almost nothing. Crews began on 19 March in both 1995 and 2020. The road opened on 21 July in 1995 and on 29 May in 2020, fifty-three days apart from the same start date.
Closings are steadier than openings. Of the 46 closings the table records, the 2026 season still being open, twelve fell in October, 28 in November and six in December. The earliest is 18 October 1996 and the latest is 18 December 2013. Autumn is the reliable half of this road's year.
If you want one planning rule out of all of that: the road was already open on 15 June in 34 of 47 recorded years, and on 15 May in five of them. Anything in May is a gamble, the back half of June is a reasonable bet, and July through the first half of October is as close to certain as this road gets.
The scale of the job is the reason the date moves. The Park Service describes the road itself this way:
Highway 89 through Lassen Volcanic National Park is known as the official park highway. This 30-mile stretch traverses avalanche-prone slopes with up to 2,000 foot drops and can hold a snowpack up to 40 feet deep.
National Park Service, spring snow clearing, read 2 October 2026
Clearing operations usually begin as early as mid March and continue for about two months before the highway is entirely cleared. Crews start where the snow is shallowest and work toward the summit, in a fixed order the Park Service publishes:
Thirty miles of road, cleared in three passes from both ends toward the highest ground. The Park Service lists what holds it up: heavy snowpack with deeper drifts in some areas, trees and boulders that have fallen across the road and been buried in the snow, rockslides once the melt starts, avalanches over sections already cleared, fresh storms during the operation, snow removal in the parking areas, road and shoulder repairs, lingering ice after the snow is gone, and equipment repair. Snow depth reaches up to 30 feet at the highest elevations, with drifts occasionally as high as 40 feet.
Every one of those but the last is weather, or what weather leaves behind. The last is a machine breaking down in the snow. None of them can be put in a calendar in February.
Cleared and open are two different states, and the gap between them is weeks in some years:
Once a section of road is cleared, it remains closed to vehicles until the last layer of snow and ice melts and all road preparations (e.g. signs, shoulder grading, parking areas) are complete.
National Park Service, spring snow clearing, read 2 October 2026
There is a window in that gap worth knowing about. Before the highway opens to cars, cleared sections open to people on foot and on bikes. It is the only time of year you get a national park road to yourself, and it is the single best reason to come here in April or May rather than feel cheated by the closure.
The outlying roads are a separate question, and they include both of ours. The two park entrances that start in Chester, Warner Valley and Juniper Lake, are not on the park highway at all. The Park Service says it may also plow Butte Lake, Warner Valley or Juniper Lake roads depending on the spring snow depth, and adds that the paved sections of the Warner Valley and Juniper Lake roads are maintained by Plumas County and are usually not plowed. Its own line on those two is that they are not maintained in winter and vehicle travel is not advised when snow covers the road, roughly November through June. Butte Lake is a six mile dirt and gravel road closed on about the same terms, November to April.
So the park highway opening is not the date our side of the park opens. Both are in the full Lassen guide, which carries the road descriptions, the distances and the fees.
This page is a record, not a road status. For the week you are actually travelling, the Park Service publishes the live state on its own site and tells you exactly how to read it:
Current road closures are posted as alerts to the top of every page. If there is no active closure alert, then the park road is fully open.
National Park Service, spring snow clearing, read 2 October 2026
So: open the park's spring clearing page, and if there is no closure alert at the top of it, the road is open. During the clearing season that page also carries a map of which sections are open and which are not.
We are not going to email you when the road opens. Nothing exists on our side to keep that promise true, and a promise nobody can keep is worse than no promise. We also do not publish our own road report. The Park Service is the source, every time, and the link above is the one to bookmark.
For the highways that get you here rather than the road inside the park, chain control is a different system with its own rules, and it has its own post.
Most people who look up this date are deciding whether a trip is worth taking. It usually is, and here is what is actually open in the eight months the highway is not.
Two plowed entrances. In winter, vehicle access is limited to the Kohm Yah-mah-nee Visitor Center at the southwest entrance and the Loomis Plaza and Manzanita Lake parking area at the northwest entrance. Both, per the Park Service, offer winter routes for snowshoeing and cross-country skiing, and areas for sledding and snowplay. Those two lots are the winter park.
The entrance fee collapses. From 1 December to 15 April the whole fee schedule drops to ten dollars, for a vehicle, a motorcycle or a person on foot alike, against thirty dollars for a vehicle in season. Hardly anybody in this corridor mentions it.
The lake does not close. Lake Almanor is under a mile from us and is open to trout fishing every month of the year under the statewide rule. It is the reason to come in the months the park road is shut, and it has its own guide.
Neither does the forest. The Lassen National Forest trail network, five snowmobile staging areas and a sled dog race site on our own road are all outside the park boundary and none of them waits for the highway. That is the winter guide.
The park is open every day of the year. What changes is how much of it you can reach with a car.
At the junction of Highway 36 and Highway 89, three miles west of Chester, which is the town both of the Chester-side park entrances start from. Open every month of the year, including the ones the park highway is not.
No booking fee, no resort fee, no cleaning fee. Plumas County adds 9% occupancy tax and a 3% tourism district assessment. First bookable night is 30 September 2026.
The two entrances that start in Chester, what those roads are really like, and the fees including the ten dollar winter rate.
Read the Lassen guideFive snowmobile staging areas, the park’s ten dollar winter fee, and the sled dog race site on our own road.
Read the winter guideWhat R1, R2 and R3 mean on the two highways that reach us, and what a citation costs.
Read the chain control postLast checked 2 October 2026. The counts, medians and comparisons in the section above are our own arithmetic on the Park Service's table and nothing else; the table is reproduced in full so you can redo any of them. Road dates change, and the newest row on the source page changes with them, so check the source for the week you are travelling rather than trusting a copy.